A Notice From NJ Division of Codes and Standards

November 5, 2018

 

Notice Regarding the Use of Digital Seals for all Projects Submitted to New Jersey BCPR

 

All projects submitted to the Bureau of Construction Project Review must be submitted utilizing our ePlans Electronic Plan Review System.  Please be advised, starting in January of 2019, we will be requiring all documents to be provided with a digital signature and seal.

The NJ Board of Professional Engineers and Land Surveyors adopted their rules for digital signatures and seals in November of 2015 and NJ Board of Architects adopted their rules for digital signature and seals in May of 2017.  As such, we believe it is reasonable to expect all design professionals submitting documents to the BCPR to have digital seals by January of 2019.

You may find the following links to the DCA-Division of Codes and Standards webpage helpful.

Architects:  http://www.state.nj.us/dca/divisions/codes/alerts/pdfs/arch%20elec%20sign%20seal%20memo%205_22_17.pdf

Engineers:

http://www.state.nj.us/dca/divisions/codes/alerts/pdfs/engr%20elec%20sign%20seal%20memo%202_24_16.pdf

Be advised, electronic signatures and seals are for ELECTRONIC submissions only.  Once released by the Department, all hard-copied plans must contain an original signature and an embossed seal.

John N. Terry, Assistant Director, Division of Codes and Standards

By | Posted in Architecture in NJ, Codes & Regulations | Tagged: , , | Comments (0)

Categories

Archives

Upcoming Events

  1. Innovation in Action — ASID NJ Design Symposium & Trade Show

    September 17 @ 8:00 am - 5:00 pm
  2. Back to School Symposium

    September 18 @ 8:00 am - 12:00 pm
  3. ALNNJ: September Member Dinner Meeting

    September 19 @ 6:00 pm - 8:00 pm

Architects are skilled professionals who listen to you, interpret your wishes, help realize your building dreams, and add value at every stage of a project.

414 Riverview Plaza, Trenton, NJ 08611
(609) 393-5690
info@aia-nj.org